Complete structural fabrication representing 500 tons of heavy steel framework.
Installed a 5km gas routing network with precision welding.
Massive trenching and concrete foundation laying for commercial storage hub.
Heavy lifting and alignment of a 150-ton industrial furnace block.
Controlled extraction of 4 decommissioned chemical silos using 300T cranes.
Fabrication and protective epoxy coating of multiple 50k liter storage tanks.